Skip to content
View in the app

A better way to browse. Learn more.

Benchmark Six Sigma Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Topics

Leaderboard

Popular Content

Showing content with the highest reputation on 04/02/2021 in all areas

  1. 1 point
    ICUKU (Impact, Control, Known, Unknown, Uncontrollable) is a 9-square Matrix tool that can be deployed for Categorizing the possible solutions on an Impact Vs Implementation grid. On the "X" axis we Impact categories (Low, medium, High) and on the Y-axis we have Controllable ( further subcategorized as Known and Unknown ) and Uncontrollable factors. This Matrix will help us to first categorize and then prioritize the factors/solutions ( Vital "Xs" , independent variables ). The Solutions that have been identified by the teams through various various RCA techniques can then be placed in either of the 9 cells basis the impact that the action may yield on the proposed change and the ease of implementation basis the factors that the team can also attribute the controllable , uncontrollable scope of those known and unknown solutions. Its becomes very critical that while constructing the ICUKU matrix , the team is realistic and exercises pragmatic approach when placing the solutions in the matrix cells, the success or the failure of achieving the desired results will depend upon the solutions we have identified and then categorized then as accurately as possible. Resources are limited and cost optimization along with maximum yield in shortest duration of time is what all want to achieve and this exercise will help to deliver to those expectations to an extent if done correctly. So the Solutions that exist in the HK , MK , HUK, MUK will be our scope of priority in deploying the Actions , to maximize the output. The Example below for an AHT Improvement project showcases the actions that can be deployed ,where ICUKU will be able to help us in planning our actions for best possible results. So the Actions in the cells identified as per the first Matrix , should help us identify the actions that are in our control to implement and will yield immediate results compared to rest of the actions identified.
  2. 1 point
    ICUKU [Impact, Controllable, Known, Unknown, Uncontrollable]. We cannot solve all the issues, so it is important to prioritize our issues before launching into solving problems. ICUKU has basically a nine block matrix, and its broken into 3 major categories which is Impact, controllable and uncontrollable. Impact has three separate components High, Medium and Low. We need to categorize the impact based on the priority. Controllable has two components Known and unknown. If it’s not known to be a controllable then it should be marked under unknown category, if its known one then we can mark it in the known category. Which variable we go first after for the vital few x’s? First we go with High, Medium and Known, then we go with unknown. We do not start with Un-controllable because it should not be a right scope. The objective of ICUKU is to go after the things that we can know how to control the High or Medium impact. Key objective of ICUKU: · It helps to identify the vital few x’s · Focus on what is important · It helps avoid chasing/solving x’s that are not going to improve (reduce) your defect rate · It helps to identify the controllable and uncontrollable variables
This leaderboard is set to Kolkata/GMT+05:30

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.