Skip to content
View in the app

A better way to browse. Learn more.

Benchmark Six Sigma Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Message added by Mayank Gupta,

Risk Priority Number (RPN) is a numeric assessment of a risk to help identify critical failure modes in a process or a design. It ranges from 1 to 1000. It is calculated while doing Failure Modes and Effect Analysis using the below formula 
RPN = Severity (S) x Occurrence (O) x Detection (D)

 

An application-oriented question on the topic along with responses can be seen below. The best answer was provided by Saurabh Narkar on 17th Nov 2023.

 

Applause for all the respondents - Adil Khan, Keerthi Vasan, Asangi Pathirana, Saurabh Narkar.

Risk Priority Number

Featured Replies

Q 617In FMEA, Risk Priority Number helps us assess the risk in the process. While potentially RPN can range from 1 to 1000, could there be a process step, where the RPN is 1? Provide examples to support your answer.

 

Note for website visitors -

Solved by Saurabh N.

Can there be a process step where RPN = 1?

 

Let us first understand how RPN is calucated.

RPN = Risk Priority Number can be calculated by Formulae, Severity (S) X Occurrence (O) X Detection (D).

 

Inorder for RPN to be 1 all Severity, Occurence & Detection must be one. Let us take a example to see if this is possible.

Example

Severity

For Severity to be 1 there should not be any discernible effect, I have worked with Aircraft cabin structural drawings, there will not be any dimension which will not have a impact on the Fit, Form, Functions (rating 5-8) or actetic aspect(Rating 2-4) of the part, so having a severity of 1 which is no effect at all, its pretty rare. 

 

image.png.ba6579fcb330abb862f78118249810f7.png

 

However theoratically speaking any reference dimension in drawing can have a severity of 1, So Severity = 1

 

image.png.f26ec7578be25ce24bacdc076bc04064.png   [Reference Dimension example As per ASME Y14.5]

 

Severity = 1 

 

Occurrence 

For Occurrence to be 1 it should be 0 PPM, You may think of introducing Poke Yoke to get this, Firstly it is not possible to have Poke Yoke in all the cases, Secondly Poke yoke implementation is costly. Thirdly it makes no sense in introdusing Poke Yoke for every non critical dimension. Occurence can have 1 if you have Poke Yoke. 

 

image.png.a14437be8a6b0cb499c650386d4439d3.png

Example :- Manual Tig Welding fixture can have poke yoke to prevent end fitting incorrect orienatation.

Occurence = 1

 

Detection

For Detection to be 1 you can have Poke Yoke in inspection fixture, again poke yoke is not always possible. For non critical items any visual or dimensional inspection will be adequate. Yes Detection can be one if Poke Yoke can be introduced.

 

image.png.734444f4b239315ec9331001a61bd280.png

Example :- Inspection fixture can have poke yoke blocks / Pins to prevent part seating if end fitting incorrect orienated.

Detection = 1

 

Summary

Theoratically speaking yes its possible, if you have met criteria provided above RPN can be 1. Pratically RPN cannot be 1 as there will always be a impact for any dimension non conformance, introduction of Poke Yoke is not always feasible for Occurence and Detection, even is possible this may not make a business case to do something like that when simple dimentional inspection can suffice (Over processing).

RPN = severity * occurrence * detection

 

Wherein 


severity 1 - low impact, 10 - high impact


Occurrence 1 - rare, 10 - frequent


Detection 1 - easy to detect, 10 - tedious to detect

 

A value of 1 is possible when all three parameters are minimal - minimum impact, extremely rare occurrence and highly effective detection system.

 

Examples

 

1 - running out of stock on office supplies (pen, paper etc.). Since inconvenience is minor, rare case wherein admin is out of stock and easily detectable, RPN for this example is 1.

 

2 - slot machines underpaying a player (from Casino management perspective). Since financial impact is marginal, Slot machines rarely have technical glitch and Casino's outlier management system are highly effective, this scenario has a RPN value of 1

In FMEA, Risk Priority Number helps us assess the risk in the process. While potentially RPN can range from 1 to 1000, could there be a process step, where the RPN is 1? Provide examples to support your answer.

 

Risk priority number helps us to prioritized the potential failure modes. RPN is the product of severity, occurrence and Detection .

(RPN = Severity * Occurrence* Detection.)

In some situations it can be 1 when severity = 1 , occurrence =1 and detection 1.This is the minimum level that RPN can be.

RPN =1= 1 (Sev)*1(Occ)*1(Detection)

 

Severity number 1 shows low severity that are unnoticeable or can be reworked areas.

 

Occurrence ranking 1 implies the failure cause is very unlikely to occur,

 

Detection rank 1 implies if process automatically detect the failure and the controls will almost certainly detect the existence of a failure

 

Please refer below  Example for more understanding ,

 

low battery level of car key

In some Auto car’s if battery level is low in car key we won’t be able to start the car automatically but it is detecting by the vehicle and advised to keep the key at a designated area near steering wheel to start the car.

 

image.thumb.png.ad429b9353d4d190be7e898d86fb8297.png

 

 

 

 

  • Solution

 

The actual requirement of the FMEA is to create a very useful document used for making strategic decisions based on risk involved in process.

FMEA can be characterized in the relative risk contribution of potential failure areas associated with the process in terms of a risk priority number (RPN). This RPN can be obtained as a product of three phase of framework representing below.

 

·       Severity of Occurrence

·       Frequency of Occurrence

·       Chance of Detection

 

RPN Scales usually range from 1 to 10, with the higher number representing the higher seriousness or risk. considering ten-point Occurrence scale, 10 indicates that the failure is very likely to be occurred and is worst compared to 1 which indicates that the failure is very rare to be occurred.

 

  • Severity- Which indicates that the occurrence of severity of the potential effect of the failure is high when rated as 10 and low when rated as 1.
  • Occurrence- Which indicates that the frequency of occurrence of the potential effect of the failure is high when rated as 10 and low when rated as 1.
  • Detection - Which indicates that the chance of detection of the potential effect of the failure is high when rated as 10 and low when rated as 1.

 

For each potential cause, the individual factors occurrence (O), severity (S), and detection (D)are rated and multiplied together.

 

PRN= Severity (S) X Occurrence (O) X Detection(D)

 

In order to improve the rating of PRN suitable actions cab be taken and risk can be reduced

However, the specific rating criteria for the ranking of occurrence (O), severity (S), and detection (D) are defined by the individual organization based on process and priorities.

 

·       Reduce the severity.

·       Reduce the probability.

·       Improve the design to improve the control over detection

 

Example:- Potential failure areas with risk priority number (RPN) improvement in bottling plant.

 

Sr No

Process

Potential Failure mode

Potential effect of Failure

Severity (S)

Potential Cause/ Mechanism of Failure

Occurrence (O)

Current Process control

Detection (D)

Risk Priority No

 (S*O*D)

1

Bottling plant

Less quantity

Customer complain

5

Filler

2

Weight gauge

3

30

2

Bottling plant

Insufficient seal

Mixing with other substance

3

Heat Sealer

5

Seal Test

4

60

3

Bottling plant

Wrong marking

Expiry period

1

 Manual Labeler

5

Random In Process check

3

15

 

 

For above example below Corrective Actions can be implemented such as:  

  • Installing automatic labeler can help improving mechanism by removing potential cause for frequency of occurrence.
  • Installing sensor based continuous automatic Checking system to reduce chance of detection.

 

 

Sr No

Process

Potential Failure mode

Potential effect of Failure

Severity

Potential Cause/ Mechanism of Failure

Occurrence

Current Process control

Detection

Risk Priority No

1

Bottling plant

Less quantity

Customer complain

5

Filler

2

Weight gauge

3

30

2

Bottling plant

Insufficient seal

Mixing with other substance

3

Heat Sealer

5

Seal Test

4

60

3

Bottling plant

Wrong marking

Expiry period

1

Automatic Labeler

1

Continuous Sensor based Automatic Checking

1

1

 

 

Saurabh Narkar has given the best answer to the question by providing an example of risk reduction leading to RPN of 1.

 

Answers from Adil Khan and Keerthi Vasan are also a must read.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.