Skip to content
View in the app

A better way to browse. Learn more.

Benchmark Six Sigma Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

G.Vikram Rangamani

Members
  • Joined

  • Last visited

  1. My first response would be on confirming with the leadership team on whether they are convinced enough that their business is having wastes, as I require their support for identifying and removing wastes from their business.Post receiving their signal, I would validate 2 things. a) Are we processing more than what is required? Are we receiving more than what we could process? The above 2 points will address the over production and inventory wastes. c) Arrive at a process map to understand the end to end process. d) Arrive at a current state VSM that helps identify VA & NVA. This in turn will address the over processing, transport wastes. e) Review quality dashboards/audits to understand errors/defects and look for means to eliminate these defects.
  2. Both measures of central tendency and variance can be used for decision making. But variance or the spread is more trusted upon especially in life line industries like automobile,aerospace and medical equipments . It's because variance takes a call on each data point which is very crucial especially for the above mentioned industries. Unlike central tendency, It never generalizes a set of data points.Infact it uses central tendency as a reference to assess each data point and arrives at a spread that the process or the product is capable of. Central tendency can be misleading at times. Let me quote one example I studied during my BB course in Benchmark.A decision has to be taken on whether the newly appointed cricket coach can continue in his job or not. A survey has to be taken. Cricket coach needs to get a minimum 25 percent vote to continue in his job.Off 2000 people 482 support the coach.This ends up at 24.10 percent which might go against the coach.But if we run a 1 proportion hypothesis test to check if the support has truly gone below 25 percent, it gives us more light on the support and goes in favour of the new coach. It doesn't merely go by division of numbers but takes other factors like confidence level, p value into consideration. If we want to regulate things like controlling speed of a car. We establish a monitoring mechanism where a car can go as slow as x km/hr or go as fast as y km/hr. Any deviations or variations beyond the levels by any car will be tracked and reported through a device.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.