Good day sir, This is Pradeep from GB group 7 Feb batch. During my tenure in Singapore, I am an incharge of cleanroom process . The process is to stack 200 sheets (3 micron sheet on one base). It was found that there is some stack shift of 50 microns for every 8 stacks. The critical X's were temperature of the base, parallism (spec < 10 microns ) between base and sheet carrying head and the Sheet thickness. The last two were corrected and found ok. But still the occurance of one out of 35 could be seen. The set point was 50 deg C. When base temperature reduced to 40 deg, the stack shift was observed ( same machine) at the same rate of occurance during production. Hence the mistake proofing was done. It also been observed that the bonding strength between sheet was low upto 40 Deg C and kept on increased to 70 Deg C then stabilized. So recommonded and implement 70 Deg for all material and machines ensuring no quality problem. The reduction in defective reflected for a cost down of S $10 K per month. Hope I could answer for mistake proofing. With regards Pradeep