Special process -For a production process, if the result output cannot be verified by monitoring or measurement and, deficiencies only understood after the product is in use, the process must be validated. as per standard AS9100:2009, clause 7.5.2, these processes are often referred as “special processes”.
special Requirement-These are requirements that you or the customer have identified as having a high risk of not being met – for instance, on-time delivery of a project with a very short timeline. These requirements need to be included in the process for operational risk management, which is a requirement of the AS9100 Rev D standard. There are many things to consider when identifying these requirements, including complexity of the processes, maturity of the products and services, and past performance.