Skip to content
View in the app

A better way to browse. Learn more.

Benchmark Six Sigma Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

How To Validate A Process Which Has One Side Tolerance?

Featured Replies

If we have two sided tolerance then we opt Cp & CpK for validating, but in some cases there exist only one side tolerance like

1) Fuel delivery minimum 80Litres/hr

2) Maximum current consumption 5.5amps.

3) OD: 2+0.2

How to validate the process for the above mentioned?

  • 2 months later...

I am not sure what you mean by validation. If you are trying to find out the number of defects for a one-sided specification, tools such as Minitab can do this for you. If you are trying to see if your improvement made a difference or not, you can set up an appropriate hypothesis test.

  • 3 weeks later...

Dear Sathish,

You can use Sigma Level as a metric which can be calculated in several ways. For one sided tolerance and normally distributed data, the method works out as

Sigma Level = (upper specification limit - average)/ standard deviation

OR

Sigma Level = (average - lower specification limit)/ standard deviation

 

Regards,

VK

 

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.