Skip to content
View in the app

A better way to browse. Learn more.

Benchmark Six Sigma Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Quiz #1 for Green Belt 18 members have voted

  1. 1. Six Sigma was initiated by Motorola. which of the following is true?

    • Motorola created most of the Six Sigma techniques.
      7%
      2
    • Motorola compiled the best problem-solving techniques since ages under Six Sigma approach.
      67%
      19
    • Both of the above.
      17%
      5
    • None of the above.
      7%
      2
  2. 2. SIPOC is typically a part of Charter document in a Lean Six Sigma Projects. True/ False

    • True
      42%
      12
    • False
      57%
      16
  3. 3. Choose the correct option –

    • As variation reduces, DPMO increases and Sigma Level goes up.
      3%
      1
    • As variation increases, DPMO increases and Sigma Level goes down.
      10%
      3
    • As variation reduces, DPMO decreases and Sigma Level goes down.
      0%
      0
    • As variation reduces, DPMO decreases and Sigma Level goes up.
      85%
      24
  4. 4. Choose the option that is NOT TRUE -

    • If root cause is known, but solution is unknown, Six Sigma techniques can still be utilized.
      17%
      5
    • If root cause is unknown and solution is unknown, Six Sigma techniques can be used.
      14%
      4
    • If root cause and solution are known, Six Sigma techniques are not useful.
      67%
      19
  5. 5. DMAIC and DMADV are two popular methodologies for Lean Six Sigma. Choose the correct option -

    • If DMADV is done well while designing process, DMAIC will not be needed later.
      7%
      2
    • If DMADV is done well while designing process, DMAIC will be rarely needed later.
      17%
      5
    • If DMADV is not done well while designing process, DMAIC will not be of use.
      3%
      1
    • DMAIC will mostly be needed irrespective of the use of DMADV in a process.
      71%
      20

Please sign in or register to vote in this poll.

Featured Replies

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.