October 11, 201312 yr I am need to calculate the FTE for set process. Below are the details for same . Processing time of task = 3minsTurn around time of task = 20mins Hourly flow given below . "07-08""08-09""09-10""10-11""11-12""12-13""13-14""14-15""15-16""16-17""17-18""18-19""19-20""20-21""21-22""22-23""23-24""00-01""01-02""02-03""03-04""04-05""05-06""06-07"SD 8.4957729.1291539.4344127.84817818.4826327.3254631.6627632.5543824.1082419.8829418.8945622.1803719.6444926.9159935.8464832.3813124.0387526.0614132.3472529.3481225.1452513.919557.3242425.559699Average Volume 151814122131404443353546545949402930393125191111 How would I arrive at a FTE required for this team?
Create an account or sign in to comment