Skip to content
View in the app

A better way to browse. Learn more.

Benchmark Six Sigma Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

anilambala

Members
  • Joined

  • Last visited

  1. Dear Sir 1)What is difference between control chart and pre control chart. 2)which we have to do first regards anil gupta
  2. hello about DPU,DPO,DPMO DPU ( DEFECT PER UNIT)=TOTAL NO. OF DEFECTS OBSERVED /TOTAL NO. OF UNIT PRODUCED. DPO(DEFECT PER UNIT OPPORTUNITY)=DPU/m where m is no. of opportunity DPMO (defect per million oppurtunity)=DPU/m*1000000 for example If m=8 DPU=1 DPO=1/8=0.125 DPMO=DPO/M*1000000=125000 regards anil gupta
  3. dear sir why we are talking about six sigma and not for seven sigma. regards Anil Gupta
  4. Hi Sir what is proto type, Pre launch,production control plan, Regards anil gupta
  5. HI sir I have collect reading 98 numbers for process with diameter 32.3+/-0.2 mm.All data is coming with this tolerence limit .still cp and cpk is coming 0.6 and 0.34 respectively.Can anybody suggest me what interpret this result. How i can get 6 sigma.should i have to increase tolerence limit. what is sub group. regards Anil gupta
  6. What about effectiveness.Can i have more clarification ? Regards Anil Gupta
  7. Hi Leon I am new to this subject.I would like you to refer six sigma for quality and productivity promotion-sung H.PARK. True value is only desired but process mean during one time period is not same with other time due to unavoidable reason.due to this in 6 sigma level process defect is correspond to 3.4 PPM in place of zero. I may be wrong but 6 sigma levle is +/-6 sigma ipo of +/-3sigma.Plz correct me any body if my concept is not wrong. Anil gupta
  8. AND ONE MORE TERM IS THERE THAT IS EFFECTIVENESS.WHICH IS QUALITY RELATED TERM. EFFECTIVENESS=OK QUANTITY/TOTAL QUANTITY ANIL GUPTA
  9. Dear Sir You have told for prevention and detection filling as per 5c.I want to know in preventive control can i use set up approval,work instruction,check chart. 2)if i have applied preventive control ,can i give detection control too. regards anil gupta
  10. I want to apply hypothesis test for hose manufacturing process.Process is curing.In this hose is kept in steam vessel at 144 degree and 90 minutes. My null hypothesis is temp is =144 degree alternate hypothesis is temp <144 degree. I have little understanding bout this test.I want to clear it with example and exercise.
  11. BEFORE FMEA YOU HAVE TO CLEAR OUT PROCESS FLOW AND CHARACTERSITIC MATRIX BETWEEN PROCESS PARAMETER AND DEFECT.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.