Skip to content
View in the app

A better way to browse. Learn more.

Benchmark Six Sigma Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Shraddha Sequiera

Lean Six Sigma Black Belt
  • Joined

  • Last visited

Solutions

  1. Shraddha Sequiera's post in Project Artifacts was marked as the answer   
    PMP
    DMAIC
    Comparision
    Project phase
    Typical artifacts
    Project phase
    Typical artifacts
    Initiation
    Business case
    Define phase
    Project Charter
    PMP uses various documents in the initiation phase DMAIC model uses a Project charter which covers business case, vision and team details along with emphasis on dollar saving or impact it would make for that specific project project.
    Project vision statement
    Value Stream Map
    VSM help us understand the entire process and understand the current process v/s future state that we anticipate it to be
    Project charter
    Roadmap
    Team charter
    Planning
    Assumption log
    Measure
    Process Maps
    Capability Analysis
    Pareto chart
    PMP may have a list of artefacts to be created but for DMAIC project the artefacts list is fairly simple. During the planning stage of PMP and Measure stage of DMAIC we create documents to record the activities performed, ability of the process to meet the client standard and record any variations
    Risk register
    Issue register
    Change log
    Stakeholder register
    Comms management plan
    Release plan
    Scope management plan
    Test plan
    Quality plan
    Logistics plan
    Work breakdown structure
    Analyse & Improve
    Root Cause Analysis
    Failure Mode and Effect analysis
    Variation charts
    Kaizen events
    The data gathers in the measure phase to used for further analysis to identify the main causes and assess any risk that could be mitigated or accounted for. We will aslo use the data to assess the level of variations in the X that we have which can be tracked through variation charts, and other data points dereived from baseline studies
    Product breakdown structure
    Organizational breakdown structure
    Risk breakdown structure
    Budget baseline
    Milestone schedule baseline
    Scope baseline
    Performance measurement baseline
    Gantt chart
    Requirements and requirements traceability matrix
    Execution
    Dashboard
    Flow charts or process maps as needed
    MOU, contracts and agreements (but could be earlier in the life cycle depending on the type of vendor)
    Monitoring and Control
    Quality report
    Control
    Control plan
    5 S
    Poka Yoke
    Handover documents
    The control plan works hand in hand with the quality and risk reports that are shared during the Monitring phase of PMP. A step further to DMAIC will be how do we address these and pu the necessary contrls on place to sustain consistent performance. Once the process is capable and stable the project is decomissioned and handover to the relevant stakeholder is initiated.
    Risk report
    Status report
    Ad hoc stakeholder reports
    Closure
    Project closure document
    Handover documents
     
  2. Shraddha Sequiera's post in The role of Business Excellence Master Black Belt was marked as the answer   
    Six Sigma expert specializes in efficiency and management as they would always look at maximizing output, minimizing cost whilst not compromising on Quality. A mater black belt acts as a leader and is able to develop and design the path of internal leaders, other six sigma specialist and management as a whole. He acts a guide in right selection of project until its executed and delivered with quantifiable impacts.
     
    The various roles that a Master Black belt can opt for
    Project Manager
    Strategy building & Management
    Business Excellence
    Quality Management
    Change & Transformation roles
    Process Excellence/Re-Engineering roles
    Risk and Compliance roles
     
     
    Re-Engineering and Transformation roles can be more challenging
    High Risk
    May not be replicable
    Each company will have their own challenges & shortcoming
    Different Priority for Leader in Management
    Resistance to Change
     
    Business Excellence & Quality Management  can be more rewarding
    Not limited to a specific Industry
    Free Lancing is possible
    Helps in increased profits, CSAT levels, Employee satisfaction levels
    Encourage innovation

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.