• Main website
  • Case Studies Home
  • Case Studies
    • Green Belt
      • Example Green Belt Projects-Health Care
      • Example Green Belt Projects-Manufacturing
      • Example Green Belt Projects-Services
    • Black Belt
      • Example Black Belt Projects-Health Care
      • Example Black Belt Projects-Manufacturing
      • Example Black Belt Projects-Services
    • Master Black Belt
    • Lean Success Stories
  • Articles
    • LSS topics of common interest
    • Insights for Green Belts
    • Green Belt tool application examples
    • Insights for Black Belts
    • Black Belt Tool Application Examples
    • Lean Insights
    • Lean Six Sigma Leadership
    • For Master Black Belts
    • New to Lean Six Sigma
      • Lean Expert Basics
      • Six Sigma Basics
    • Leisure and Fun
  • Blog

Applying Six Sigma to Improve Diagnostic Imaging

Diagnostic ImagingSix Sigma Methodology when applied to improve diagnostic imaging such as PET, PACS, RIS, Ultrasound etc., it brings about process improvement through optimizing the already specialized systems.

 

The Six Sigma methodology is aimed at improving report-turnaround time, and increasing capacity and productivity. The process tries to eliminate non-value-added services, find out the root causes, and mitigate redundancies to optimize the existing processes. When the DMAIC process is also able to achieve a significant financial gain, the management adapts it and trains its staffs to increase service quality.

 

The process improvement starts with scoping. Choosing the right project to work on can prove to be beneficial in terms of finance, quality as well as production. The VOC and the KPIs are gathered, along with the financial data and existing cycle times. The process is then mapped based on the collection. The most critical drivers are analyzed, which might show slow start up times, or patients not showing up for appointments.

 

To address such bottlenecks, actions plans are devised as per the Six Sigma Methodology. Once the improvements are in place, it is also important to control the process changes. Dashboards and balanced scorecards help to keep the process monitored. Two such process improvements were implemented, one at Carle Clinic and the other at Baptist Citizens Medical Center in Alabama, both of which gained significantly from Six Sigma implementations.

 

While at the Carle Clinic, the enhanced system helped gain $390,000 annually, increased satisfaction, and achieved better predictability. At the Baptist Citizens Medical Center it helped add 260 additional CT slots and 780 additional US slots annually, and made $314,744 every year.

 

Six Sigma provides excellence into the area of diagnostic imaging department by looking into additional areas such as marketing and specialized training. It helps meet customer expectations, by streamlining the processes and thus allowing the system to thrive efficiently.

See full story on isixsigma.com

March 20, 2015   Benchmark Six Sigma
Case Studies, Example Green Belt Projects-Health Care, Green Belt Qualified
×

  • Reducing Door-to-Inflation Time for the AMI Patient
  • The Cause and Effect (a.k.a. Fishbone Diagram)

Leave a Reply

Cancel

You must be logged in to post a comment.

Categories

  • Articles
    • Black Belt Tool Application Examples
    • For Master Black Belts
    • Green Belt tool application examples
    • Insights for Black Belts
    • Insights for Green Belts
    • Lean Insights
    • Lean Six Sigma Leadership
    • Leisure and Fun
    • LSS topics of common interest
    • New to Lean Six Sigma
      • Lean Expert Basics
      • Six Sigma Basics
  • Case Studies
    • Black Belt Qualified
      • Example Black Belt Projects-Health Care
      • Example Black Belt Projects-Manufacturing
      • Example Black Belt Projects-Services
    • Green Belt Qualified
      • Example Green Belt Projects-Health Care
      • Example Green Belt Projects-Manufacturing
      • Example Green Belt Projects-Services
    • Master Black Belt
  • Featured Articles
  • Lean Qualified
    • Lean Success Stories
  • Project Management Articles
  • Uncategorized

Archives

  • November 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • January 2014
  • December 2013
  • November 2013
  • October 2013
  • September 2013
  • August 2013
  • July 2013
  • June 2013
  • May 2013
  • April 2013
  • March 2013
  • February 2013
  • January 2013
  • December 2012
  • November 2012
  • February 2012
  • March 2011
Copyright © 2021 Benchmark Six Sigma